Sensor details
05 March 2019
17:17
<<2_Sensor
26_3um_3D Hetro Nanostructures CoFe_drawing of crosses before measurments
05_03_2019.pdf>>
·
This sensor is old fabicated by Merlin. It has 3µm
cross size.
·
It has been handed to Fabritizo to grow these structures shown below

Loading inside the IVC
05 March 2019
17:30
·
The sensor Has been loaded on the Yoke directly after
taking it out from the SEM chamber.
·
Closing the IVC very quick.
·
Pumping out the IVC for two hours (10^-5 mbar)
Loading
inside Janis
06 March 2019
09:30
·
Mohanad, Jens and Jonathan, managed to load the IVC
inside Janis. The process was very gentle and the He level was 15 in. We let
the system relax and filled He after 1 hour.
Introducing an exchange
gas_attention please_!!
06 March 2019
13:30
Important Notes:
o
We had problem when we introduced and exchange gas. The temperature was
around 200K and we introduced 1mbar for 1s. The process of cooling was very
fast and we lost a lot of He(l). The cooling rate was very high and we reached
4k in 1.5 hour. That was not good and we should next time wait at least one day
to cool naturally and then intorduce an exchange gas.
Important Notes:
Don't introduce exchange gas too early (T > 200 K)
Be careful and introduce as little exchange gas as
possible
<<20190306-1600-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R1-9.25KO_R2-1MO_T-10K_0degSensor_3D-Tetra_Nano_CoFe_SR-0.02-T-min_Gradio_Up.dat>><<20190306-1600-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R1-9.25KO_R2-1MO_T-10K_0degSensor_3D-Tetra_Nano_CoFe_SR-0.02-T-min_Gradio_down.dat>>
M1: + Gradio 10K
Filename:
20190306_1600_...
Wednesday, 6. March
2019
15:31
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()

![]()
![]()
![]()
|
+
200 mT |
-200
mT |
|
4
μV |
-11
μV |
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()

![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Experiment Setup:
T
= 10K
|
|
1 |
|
|
1
MΩ |
|
|
9,25
kΩ |
|
|
0 |
|
|
1
MΩ |
|
|
1
μA |
|
|
1
μA |
|
|
0 |
|
Sens: |
20
μV |
![]()
![]()
Lock-In Setup:
|
Sens: |
20
μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
Cables Setup:
|
|
13-1 |
|
|
6.
8 |
|
|
14.
7 |
Magnet Setup:
|
Range: |
±
200 mT |
|
Rate: |
20
mT/min |
Important Notes:
M2:
+ Gradio 20K
Filename:
20190306_1700_...
Mittwoch, 6. März 2019
16:00
Cables Setup:
|
|
1-13 |
|
|
6.
8 |
|
|
14.
7 |
Experiment Setup:
|
T |
20
K |
|
|
1
V |
|
|
1
MΩ |
|
|
10,5
kΩ |
|
|
0 |
|
|
1
MΩ |
|
|
0,99
μA |
|
|
1
μA |
|
|
0 |
Lock-In Setup:
|
Sens: |
20
μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
50*210/1000
= 10,5
Magnet Setup:
|
Range: |
±
250 mT |
|
Rate: |
8
mT/min |
Gradiometry Balance:
|
|
9.5
μV |
|
|
-14.2μV |
|
Mean: |
-2.5
μV |
Important Notes:
M3:
+ Gradio 30K
Filename:
20190307_0900…
Donnerstag, 7. März 2019
09:24
Cables Setup:
|
|
1-13 |
|
|
6.
8 |
|
|
14.
7 |
Experiment Setup:
|
T |
30
K |
|
|
1
V |
|
|
1
MΩ |
|
|
44,4
kΩ |
|
|
0 |
|
|
1
MΩ |
|
|
0,99
μA |
|
|
1
μA |
|
|
0 |
Lock-In Setup:
|
Sens: |
10
μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
Magnet Setup:
|
Range: |
±
400 mT |
|
Rate: |
30
mT/min |
Important Notes:
R12
= 50*888/1000=44,4 kΩ
M4:
+ Gradio 1T
Filename:
20190307_1200…
Donnerstag, 7. März 2019
11:51
|
1st
Run |
Down |
|
1st
Run |
Up |
|
2nd
Run |
Down
again |
|
2nd
Run |
Up
again |
Measured
everything twice to make sure it's reproducable
Cables Setup:
|
|
1-13 |
|
|
6.
8 |
|
|
14.
7 |
Experiment Setup:
|
T |
30
K |
|
|
1
V |
|
|
1
MΩ |
|
|
6,05
kΩ |
|
|
0,19
kΩ |
|
|
1
MΩ |
|
|
1
μA |
|
|
1
μA |
|
|
0 |
|
|
Pos
1 (6.8 pF) |
|
|
Pos
6 (56 pF) |
Lock-In Setup:
|
Sens: |
20
μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
Magnet Setup:
|
Range: |
±
1T |
|
Rate: |
150
mT/min |
Gradiometry Balance:
|
|
30
μV |
|
|
-24
μV |
|
Mean |
3μV |
Important Notes:
Changing
Grounding of Gate (9) and
Grounding
Connection 4
Both grounded by
connecting it to voltage source with
Output of 0 V (at + connection, which is the inner connection of the
coax-cable).
The - part (outer
shield of coax-cable) is not connected.
50*121/1000
= 6,05
10*19/1000
= 0,19
M5:
+ Gradio 1.5T
Filename:
201903
Donnerstag, 7. März 2019
16:39
Cables Setup:
|
|
1-13 |
|
|
6.
8 |
|
|
14.
7 |
Experiment Setup:
|
T |
30
K |
|
|
1
V |
|
|
1
MΩ |
|
|
6,25
kΩ |
|
|
0 |
|
|
1
MΩ |
|
|
1
μA |
|
|
1
μA |
|
|
0 |
|
|
Pos
1 |
|
|
Pos
6 |
Lock-In Setup:
|
Sens: |
20
μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
Magnet Setup:
|
Range: |
±
1500 mT |
|
Rate: |
100
mT/min |
Important Notes:
50*125/1000=6,25
-----
Angle: 0deg ----
Dienstag, 12. März 2019
13:44
C: Changing angle 0deg (reference angle)
10 March 2019
19:37
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Hall
Voltage of empty cross @ 1 T before changing angle (old angle 45deg) is
-7.826 mV instead of expected cos(45)*11.164 = 7.894 |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Hall Voltage:
![]()
Update:
this formula is not write you have to multiply by 360 not dividing by

M6:
Plusses_Hloop_0deg
06 March 2019
17:00
(1)
Structures measured
|
Plusses C |
(8) Filename and data:
20190

|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
<<20190306-1700-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R1-1.01MO_R2-1MO_T-20K_0degSensor_3D-Tetra_Nano_CoFe_SR-0.008-T-min_Gradio_Up.dat>>
(3) Cables Setup:
|
|
1-13 |
|
|
8-6 |
|
|
14.
7 |
<<20190306-1700-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R1-1.01MO_R2-1MO_T-20K_0degSensor_3D-Tetra_Nano_CoFe_SR-0.008-T-min_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
0 |
|
|
0 |
|
|
1
MΩ |
|
|
1
μA |
|
|
1
μA |
|
|
0 |
|
|
|
R1=1.01MO
R2=1MO

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M7:
Plusses_Hloop_0deg
07 March 2019
09:13
(1)
Structures measured
|
Plusses |
(8) Filename and data:
20190

|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
<<20190307-0900-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R1-1.01MO_R2-1MO_T-30K_0degSensor_3D-Tetra_Nano_CoFe_SR-0.03-T-min_B-0.4T_Gradio_Up.dat>>
(3) Cables Setup:
|
|
1-3 |
|
|
6.
8 |
|
|
14.
7 |
<<20190307-0900-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R1-1.01MO_R2-1MO_T-30K_0degSensor_3D-Tetra_Nano_CoFe_SR-0.03-T-min_B-0.4T_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
0 |
|
|
0 |
|
|
1
MΩ |
|
|
1
μA |
|
|
1
μA |
|
|
0 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M8:
Plusses_Hloop_0deg
07 March 2019
09:28
(1)
Structures measured
|
Plusses |

|
(2) Measurement
type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
20190
<<20190307-1200-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R11-1MO_R12-6.05KO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.15-T-min_B-1T_gate-0V_Gradio_Up.dat>>
<<20190307-1200-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R11-1MO_R12-6.05KO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.15-T-min_B-1T_gate-0V_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
6.05kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M9:
Plusses_Hloop_2nd of M8_0deg2
07 March 2019
09:53

(1)
Structures measured
|
Plusses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<2nd_20190307-1200-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R11-1MO_R12-6.05KO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.15-T-min_B-1T_gate-0V_Gradio_up.dat>>
<<2nd_20190307-1200-I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R11-1MO_R12-6.05KO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.15-T-min_B-1T_gate-0V_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
6.05kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M10:
Plusses_Hloop_0deg
07 March 2019
10:03

(1)
Structures measured
|
Plusses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190307_1700_I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R11-1MO_R12-6.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.1-T-min_B-1.5T_gate-0V_Gradio_Up.dat>>
<<20190307_1700_I1-1-13_I2-8-6_GBIP8-14-7_Vin-1V_R11-1MO_R12-6.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.1-T-min_B-1.5T_gate-0V_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
6.25kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M11:
Plusses_Hloop_0deg0
08 March 2019
08:00

(1)
Structures measured
|
Plusses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190308_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2V_R11-1MO_R12-8.9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_up.dat>>
<<20190308_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2V_R11-1MO_R12-8.9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
8.9kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M12:
Plusses_Hloop_0deg
08 March 2019
09:00

(1)
Structures measured
|
Plusses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190308_0900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_up.dat>>
<<20190308_0900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_plusses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|

(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
8.9kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|
(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M13:
Crosses_Hloop_0deg
08 March 2019
10:24

(1)
Structures measured
|
Crosses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190308_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_Crosses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_up.dat>>
<<20190308_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_Crosses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
5.25kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M14:
Empty cross_Carrier concentration
08 March 2019
10:56

(1)
Structures measured
|
Empty cross 6-8 |
|
(2) Measurement type |
Hall effect |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|

(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
0 |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|
(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
<<20190308_1030_I-14-7_GBIP8-8-6_Vin-2.5V_R11-1MO_sens50mV_gate0V_.dat>>
(7) Important
Notes:
M15:
Crosses_Hloop_0deg
08 March 2019
11:06

(1)
Structures measured
|
Crosses |
|
(2) Measurement
type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190308_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.7kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_Crosses_SR-0.1-T-min_B-0.7T_gate-9-5_Gradio_down.dat>>
<<20190308_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.7kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_Crosses_SR-0.1-T-min_B-0.7T_gate-9-5_Gradio_up.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
5.7kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M16:
ASI_Hloop_0deg
08 March 2019
11:11

(1)
Structures measured
|
ASI_crossB |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data
<<20190308_1100_I1-3-11_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4.6kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_0deg_ASI_cross
B_SR-0.05-T-min_B-0.3T_gate-9-5_Gradio_up.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|

(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
4.6kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|
(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
C: Changing angle 90deg (Parallel to the
sensor plane)
10 March 2019
19:37
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Hall
Voltage of empty cross @ 1 T before changing angle (old angle 45deg) is
-7.826 mV instead of expected cos(45)*11.164 = 7.894 |
||||||||||||||
|
(8) Filename and
data: |
<<20190308_1600_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_90degSensor_plus_cros_emp_SR-0.1-T-min_B-1T_gate-0V_Parallel_down.dat>> <<20190308_1600_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_90degSensor_plus_cros_emp_SR-0.1-T-min_B-1T_gate-0V_Parallel_up.dat>> |
Hall Voltage:
![]()
M17:
Plusses_Hloop_90deg
11 March 2019
11:17

(1)
Structures measured
|
Plusses |
|
(2) Measurement type |
Hloop_Gradio_for fun |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190308_1500_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-0_R13-0_R21-1MO_C11-1_C21-6_T-30K_90degSensor_plusses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_down.dat>>
<<20190308_1500_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-0_R13-0_R21-1MO_C11-1_C21-6_T-30K_90degSensor_plusses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_Up.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|

(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
0 |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
90 |
|
|
|
(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
The
gradio_setup is not usefull at 90deg_therofre, this measurment done for fun!!
M18
and 18.1:
Plusses_Crosses_empty_Hloop_90deg_2times
08 March 2019
11:27

(1)
Structures measured
|
Plusses_Crosses_empty |
|
(2) Measurement type |
Hloop_parallel |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
VH (GB8) |
|
|
|
VH(GB9) |
|
|
|
VH(GB13) |
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190308_1600_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_90degSensor_plus_cros_emp_SR-0.1-T-min_B-1T_gate-0V_Parallel_down.dat>>
<<20190308_1600_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_90degSensor_plus_cros_emp_SR-0.1-T-min_B-1T_gate-0V_Parallel_up.dat>>
<<2nd_20190308_1500_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_90degSensor_plus_cros_emp_SR-0.1-T-min_B-1T_gate-0V_Parallel_down.dat>>
<<2nd_20190308_1500_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_90degSensor_plus_cros_emp_SR-0.1-T-min_B-1T_gate-0V_Parallel_up.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
0 |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
90 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M18.1 has
same parameters of M8
M19:
Plusses_Crosses_empty_Hloop_90deg_15mT/min
09 March 2019
12:07
(1)
Structures measured
|
Plusses_Crosses_empty |

|
(2) Measurement type |
Hloop_parallel |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
VH (GB8) |
|
|
|
VH(GB9) |
|
|
|
VH(GB13) |
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190309_1200_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30.9K_90degSensor_plus_cros_emp_SR-0.015-T-min_B-1.5T_gate-0V_Parallel_up.dat>>
<<20190309_1200_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30.9K_90degSensor_plus_cros_emp_SR-0.015-T-min_B-1.5T_gate-0V_Parallel_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|

(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
0 |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
90 |
|
|
|
(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
_Very
slow sweeping rate done during the weekend and at different days
C: Changing angle 45deg
10 March 2019
19:37
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Hall
Voltage of empty cross @ 1 T before changing angle (old angle 45deg) is
-7.826 mV instead of expected cos(45)*11.164 = 7.894 |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Hall Voltage:
![]()
M20:
Plusses_Hloop_45deg
10 March 2019
14:00

(1)
Structures measured
|
Plusses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190310_1400_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.5_R13-0_R21-1MO_C11-1_C21-6_T-30K_45degSensor_plusses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_down.dat>>
<<20190310_1400_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.5_R13-0_R21-1MO_C11-1_C21-6_T-30K_45degSensor_plusses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_up.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
5.5kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
45 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M21:
Crosses_Hloop_45deg
11 March 2019
13:49

(1)
Structures measured
|
Crosses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190310_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4.75_R13-0_R21-1MO_C11-1_C21-6_T-30K_45degSensor_Crosses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_up.dat>>
<<20190310_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4.75_R13-0_R21-1MO_C11-1_C21-6_T-30K_45degSensor_Crosses_SR-0.1-T-min_B-0.5T_gate-0V_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
4.75kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
45 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
Fast
sweeping
M22:
Crosses_Hloop_45deg_8mT/min
11 March 2019
13:49

(1)
Structures measured
|
Crosses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(8) Filename and data:
<<20190311_0900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4.75_R13-0_R21-1MO_C11-1_C21-6_T-30K_45degSensor_Crosses_SR-0.008-T-min_B-0.5T_gate-0V_Gradio_up.dat>>
<<20190311_0900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4.75_R13-0_R21-1MO_C11-1_C21-6_T-30K_45degSensor_Crosses_SR-0.008-T-min_B-0.5T_gate-0V_Gradio_down.dat>>
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
4.75kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
45 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
Very slow
sweeping
M23:
Plusses_Hloop_45deg_8mT/min
11 March 2019
14:27

(1)
Structures measured
|
Plusses |
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(8) Fil
<<20190311_1400_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_45degSensor_Plusses_SR-0.008-T-min_B-0.5T_gate-0V_Gradio_up.dat>>
<<20190311_1400_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_45degSensor_Plusses_SR-0.008-T-min_B-0.5T_gate-0V_Gradio_down.dat>>
ename and data:
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
5.5kO |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
45 |
|
|
|

(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
M24:
45deg All Crosses (±1T)_2 concentration
10 March 2019
19:37

(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<20190312_1200_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_45degSensor_plus_cros_emp_SR-0.1-T-min_B-1T_gate-0V_Parallel_up.dat>> <<20190312_1200_I-14-7_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_45degSensor_plus_cros_emp_SR-0.1-T-min_B-1T_gate-0V_Parallel_down.dat>> |

C: Changing angle 42.5deg
Dienstag, 12. März 2019
13:44
M25:
Change Angle 42.5
12 March 2019
20:37
Aiming for Hall
Voltage:
![]()
Voltage measured:
![]()
Voltage
Measured next day before changing Angle again
8.286mV
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Hall
Voltage of empty cross @ 1 T before changing angle (old angle 45deg) is
-7.826 mV instead of expected cos(45)*11.164 = 7.894 |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
![]()
Dienstag, 12. März 2019
12:19

(1) Structures
measured
|
Plusses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<20190312_1500_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_42.5degSensor_plusses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_down.dat>> <<20190312_1500_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_42.5degSensor_plusses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_up.dat>> |
R11
= 190/1000*50 = 9,5



Dienstag, 12. März 2019
12:19
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Here we
have used the routine. After finishing, the magnet did not go to the Zero!!!.
I had to do that manually. We left the Temp at 30K over the
night (He level 35.80in at 9pm) |
||||||||||||||
|
(8) Filename and data: |
<<20190312_1800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_42.5degSensor_crosses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_down.dat>> <<20190312_1800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_42.5degSensor_crosses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_up.dat>> |
R11
= 180/1000*50 = 9
To check:
The magnet did not go to zero. This might be the rate was set to value and magnetd did not respond unless there is rate set to tthe set point.
He(L) level next day after leaving the temp. At 30K and heater at 500mW. The heating range was 17.2%
He(l) level next day (8:14 am) was 34.55in at 30K and heater was 17.7%mW.

M28:
42.5 deg All Crosses (±1T)_Carrier concentration
10 March 2019
19:37

(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<20190313_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_42.5degSensor_plus_cros_emp_SR-0.5-T-min_B-1T_gate-0V_Parallel_down.dat>> <<20190313_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_42.5degSensor_plus_cros_emp_SR-0.5-T-min_B-1T_gate-0V_Parallel_up.dat>> |


C: Changing angle 40deg
Dienstag, 12. März 2019
13:44
At
1T, 30k, 2.5V
![]()
![]()
Note:
VH(42.5) next day before changing to new angle, was 8.286mV
![]()
Dienstag, 12. März 2019
12:19

(1) Structures
measured
|
Plusses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<20190313_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_40degSensor_plusses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_up.dat>> <<20190313_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_40degSensor_plusses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_down.dat>> |
R11
= 190/1000*50 = 9,5



Dienstag, 12. März 2019
12:19
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<20190313_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.7kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_40degSensor_Crosses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_up.dat>> <<20190313_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.7kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_40degSensor_Crosses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_down.dat>> |
R11
= 174/1000*50 = 8,7 kO

M31:
40 deg All Crosses (±1T)_Carrier concentration
10 March 2019
19:37

(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<20190313_1400_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_40degSensor_plus_cros_emp_SR-0.5-T-min_B-1T_gate-0V_Parallel_down.dat>> <<20190313_1400_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_40degSensor_plus_cros_emp_SR-0.5-T-min_B-1T_gate-0V_Parallel_up.dat>> |

C:
Changing angle 35
12 March 2019
20:37
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Voltage
before changinig angle: 8,632 mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
![]()
Dienstag, 12. März 2019
12:19

(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
Changed
the Time Constant to 3s and readout every 3s to increase sensitivity |
||||||||||||||||||
|
(8) Filename and data: |
<<20190313_1500_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_35degSensor_plusses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_up.dat>> <<20190313_1500_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_35degSensor_plusses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_down.dat>> |
R11
= 183/1000*50 = 9,15



Dienstag, 12. März 2019
12:19
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
1.
He (l) level at 21:32, was
32.58in at 17.5% 500mW, 30K heater. Check it out next day to see how much
He(l) will be consumed if the heater left on
to stabalize the temperature. 2.
Checked next day at 7:53 am,
He(l) level was 31.44in |
||||||||||||||
|
(8) Filename and data: |
<<20190313_1730_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_35degSensor_crosses_SR-0.008-T-min_B-0.3T_gate-0V_Gradio_down_.dat>> |
R11
= 174/1000*50 = 8,7 kO
To
check_
I founf the magnet at 0T and EVE saved only one file for
up and down sweeps, the heater was on.
Fix: Checking persistend mode
From the curve , there was overload, the sensitivity has
to be set to 50µV.
Fix:
Checking the sensitivity with fast sweep after balancing Gradiomery
I found the up sweep file saved at another directory of
EVE\ui !. So, double check is realy important.
No
Fix: Happens when only a Filename is given without a path to save.
We have to repeat the mesurements.



Donnerstag, 14. März 2019
08:00
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<M34_Crosses_35deg_Hloop_down__Gradio_20190314_0800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.7kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M34_Crosses_35deg_Hloop_up__Gradio_20190314_0800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.7kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 174/1000*50 = 8,7 kO

M35:
35deg All Crosses (±1T)_Carrier concentration
10 March 2019
19:37

(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
All 3
Lock Ins have been initialized with GPIB 8. |
|||||||||||||||
|
(8) Filename and
data: |
<<M35_cros_plu_emp_35_Hloop_down_Parallel_20190314_1000_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<M35_cros_plu_emp_35_Hloop_up_Parallel_20190314_1000_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |

C:
Changing angle 30
12 March 2019
20:37
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Voltage
before changinig angle: 9,321 mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
![]()
Dienstag, 12. März 2019
12:19

(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<M36_Plusses_30deg_Hloop_down__Gradio_20190314_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M36_Plusses_30deg_Hloop_up__Gradio_20190314_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 175/1000*50 = 8,75

![]()
Donnerstag, 14. März 2019
08:00
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<M37_Crosses_30deg_Hloop_down_Gradio_20190314_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M37_Crosses_30deg_Hloop_up_Gradio_20190314_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 155/1000*50 = 7,75 kO

M38:
30deg All Crosses (±1T)_Carrier concentration
Donnerstag, 14. März 2019
17:02

(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<M38_cros_plu_emp_35_Hloop_down_Parallel_20190314_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<M38_cros_plu_emp_35_Hloop_up_Parallel_20190314_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |


C:
Changing angle 25
12 March 2019
20:37
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Voltage
before changinig angle: 9,642 mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
![]()
Freitag, 15. März 2019
08:00

(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<M39_Plusses_25deg_Hloop_up__Gradio_20190315_0800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M39_Plusses_25deg_Hloop_down__Gradio_20190315_0800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 172/1000*50 = 8,6 kO

![]()
Freitag, 15. März 2019
08:00
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<M40_Crosses_25deg_Hloop_up_Gradio_20190315_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M40_Crosses_25deg_Hloop_down_Gradio_20190315_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 90/1000*50 = 4,5 kO

M41:
25deg All Crosses (±1T)_Carrier concentration
Freitag, 15. März 2019
14:10
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<M41_cros_plu_emp_25deg_Hloop_down_Parallel_20190314_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<M41_cros_plu_emp_25deg_Hloop_up_Parallel_20190315_1400_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |



C:
Changing angle 20
12 March 2019
20:37
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Voltage
before changinig angle: 10,107 mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
![]()
Freitag, 15. März 2019
14:30

(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<M42_Plusses_20deg_Hloop_down__Gradio_20190315_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M42_Plusses_20deg_Hloop_up__Gradio_20190315_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 175/1000*50 = 8,75

![]()
Freitag, 15. März 2019
17:27
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
The routine worked fine. Go to zero
option of the magnet worked fine. The measurment finished without any
problems. |
||||||||||||||
|
(8) Filename and data: |
<<M43_Crosses_20deg_Hloop_down_Gradio_20190315_1800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M43_Crosses_20deg_Hloop_up_Gradio_20190315_1800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 140/1000*50 = 7,0

M44:
20deg All Crosses (±1T)_Carrier concentration
Sonntag, 17. März 2019
08:29
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<M44_cros_plu_emp_20deg_Hloop_up_Parallel_20190316_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<M44_cros_plu_emp_20deg_Hloop_down_Parallel_20190316_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |



C:
Changing angle 15
Samstag, 16. März 2019
08:40
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Voltage
before changinig angle:10,483 mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Cos(90)=0
Voltage
measured:
![]()
![]()
Samstag, 16. März 2019
08:57

(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<M45_Plusses_15deg_Hloop_up__Gradio_20190316_0800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M45_Plusses_15deg_Hloop_down__Gradio_20190316_0800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 170/1000*50 = 8,5

![]()
Samstag, 16. März 2019
11:00
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<M46_Crosses_15deg_Hloop_down_Gradio_20190316_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M46_Crosses_15deg_Hloop_up_Gradio_20190316_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 195/1000*50 = 9,75

M47:
15deg All Crosses (±1T)_Carrier concentration
Samstag, 16. März 2019
08:29
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<M47_cros_plu_emp_15deg_Hloop_down_Parallel_20190316_1400_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<M47_cros_plu_emp_15deg_Hloop_up_Parallel_20190316_1400_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |


C:
Changing angle 10
Samstag, 16. März 2019
14:23
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Voltage
before changinig angle: 10.847 mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Cos(90)=0
Voltage
measured:
![]()
![]()
Samstag, 16. März 2019
14:23
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<M48_Plusses_10deg_Hloop_down__Gradio_20190316_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> <<M48_Plusses_10deg_Hloop_up__Gradio_20190316_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.3T_gate-0V.dat>> |
R11
= 160/1000*50 = 8


(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<M49_Crosses_10deg_Hloop_down_Gradio_20190316_1800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-1,9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.7T_gate-0V.dat>> <<M49_Crosses_10deg_Hloop_up_Gradio_20190316_1800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-1,9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.7T_gate-0V.dat>> |
Samstag, 16. März 2019
17:40
R11
= 38/1000*50 = 1,9


M50:
10deg All Crosses (±1T)_Carrier concentration
Sonntag, 17. März 2019
07:57
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<M50_cros_plu_emp_10deg_Hloop_down_Parallel_20190317_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<M50_cros_plu_emp_10deg_Hloop_up_Parallel_20190317_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |


C:
Changing angle 5
Sonntag, 17. März 2019
08:05
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Cos(90)=0
Voltage
measured:
![]()
![]()
Sonntag, 17. März 2019
08:09
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<M51_Plusses_5deg_Hloop_down__Gradio_20190317_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> <<M51_Plusses_5deg_Hloop_up__Gradio_20190317_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> |
R11
= 100/1000*50 = 5
Pay attention to files name : typo
error in the plusses name I1-1-12 and it should be 1-13

![]()
Sonntag, 17. März 2019
13:00
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<M52_Crosses_5deg_Hloop_up_Gradio_20190317_1300_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> <<M52_Crosses_5deg_Hloop_down_Gradio_20190317_1300_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> |
R11
= 60/1000*50 = 3

M53:
5deg All Crosses (±1T)_Carrier concentration
Sonntag, 17. März 2019
17:05
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<M53_cros_plu_emp_5deg_Hloop_down_Parallel_20190317_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<M53_cros_plu_emp_5deg_Hloop_up_Parallel_20190317_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |


C:
Changing angle 0_2nd_VH(0)=VH(max)
Sonntag, 17. März 2019
17:32
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
No
File created |
Hall Voltage:
![]()
Cos(90)=0
Voltage
measured:
![]()
17 March 2019
18:00
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
It
might need to be repeated again for higher field range. |
||||||||||||||||||
|
(8) Filename and data: |
<<M54_Plusses_0deg_Hloop_up__Gradio_20190317_1800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.35kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> <<M54_Plusses_0deg_Hloop_down__Gradio_20190317_1800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.35kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> |
R11
= 187/1000*50 = 9,35

![]()
Sonntag, 17. März 2019
22:09
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<M55_Crosses_0deg_Hloop_down_Gradio_20190317_2200_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V.dat>> <<M55_Crosses_0deg_Hloop_up_Gradio_20190317_2200_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V.dat>> |
R11
= 105/1000*50 = 5,25

m56:
0deg Empty cross only_2nd_ (±1T)_Carrier concentration
Sonntag, 17. März 2019
17:05
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m56_emp_0deg_Hloop_up_Parallel_20190318_0800_I-7-14_GB8-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-01-T-min_B-1T_gate-0V_.dat>> <<m56_emp_0deg_Hloop_down_Parallel_20190318_0800_I-7-14_GB8-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-01-T-min_B-1T_gate-0V_.dat>> |
Note: I did forget doing this at the
original location of 0deg. I by mistake changged the angle to 90 and then again
to 0 to make this measuremtn. VH(max)=
11.386mV
Note:the parallel
measurments is not suitable in 0deg. I did measure only for the empty cross.
![000
09Z
009
098
冖 。 0 • 0 一 dwe … 99W
w]
0
098 |
冖 pell!J) … SéSSOJO
(P911!J) :sessnld
(pell!J) d n … SéSSOJO
冖 P911!J) dn :sessnld
009 |
09Z |
000 ㄒ
000L
09Z
009
09d
0
096 |
009 |
09Z ,
000 ㄒ](Angles_Hloops-Dateien/image1352.gif)
Used
this Measurement to calculate Strayfield for other Measurements
C:
Changing angle 90deg VH=VH(min)
Montag, 18. März 2019
08:26
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
Voltage
before changinig angle: 11,383 mV |
||||||||||||||
|
(8) Filename and
data: |
<<test79_Full_Fast_Sweep_at_90deg_empty_cross.dat>> |
Aiming
for Hall Voltage:
![]()
Cos(90)=0
Voltage
measured after balancing (1 μV @ 1T - 6.5 μV @ -1 T see test79.dat):
![]()
m57:
Plusses_Crosses_empty_Hloop_90deg_10mT/min
Montag, 18. März 2019
10:43
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m57_cros_plu_emp_90deg_Hloop_down_Parallel_20190318_1100_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V.dat>> <<m57_cros_plu_emp_90deg_Hloop_up_Parallel_20190318_1100_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V.dat>> |



C:
Changing angle 85_
Montag, 18. März 2019
20:50
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Cos(90)=0
Voltage
measured:
![]()
![]()
Montag, 18. März 2019
21:00
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m58_Plusses_85deg_Hloop_down__Gradio_20190318_2100_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V.dat>> <<m58_Plusses_85deg_Hloop_up__Gradio_20190318_2100_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V.dat>> |
R11
= 65/1000*50 = 3,25

![]()
Dienstag, 19. März 2019
07:51
(1) Structures
measured
|
Crosses |
||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and data: |
<<m59_Crosses_85deg_Hloop_down__Gradio_20190319_0800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V.dat>> <<m59_Crosses_85deg_Hloop_up__Gradio_20190319_0800_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V.dat>> |
R11
= 60/1000*50 = 3

m60:
Plusses_Crosses_empty_Hloop_85deg_500mT/min
Dienstag, 19. März 2019
15:12
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m60_cros_plu_emp_85deg_Hloop_down_Parallel_20190319_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_2.dat>> <<m60_cros_plu_emp_85deg_Hloop_up_Parallel_20190319_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_2.dat>> |

C:
Changing angle 80
Dienstag, 19. März 2019
15:12
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
![]()
Dienstag, 19. März 2019
15:12
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m61_Plusses_80deg_Hloop_up__Gradio_20190319_1530_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V.dat>> <<m61_Plusses_80deg_Hloop_down__Gradio_20190319_1530_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V.dat>> |
R12=
45/1000*50 = 3,15

![• O O 「 05
一 - -O O 「 04
-O O 「 01 1
-O O 「 010
-O COCCOg
-O O 「 08
-O O 「 07
-O O 「 06
-O O 「 03
-O O 「 02
-O O 「 01
O COCCOO
O O 「 01
O O 「 02
MagneticfieId[T]
GPIB: B … Serif
d Üvvn](Angles_Hloops-Dateien/image1436.jpg)
![]()
Dienstag, 19. März 2019
22:23
(1) Structures
measured
|
Crosses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m62_Crosses_80deg_Hloop_down__Gradio_20190319_2230_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V.dat>> <<m62_Crosses_80deg_Hloop_up__Gradio_20190319_2230_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V.dat>> |
R12
= 45/1000*50 = 2,25
Measurement has started at 22:42 :(

m63:
Plusses_Crosses_empty_Hloop_80deg_500mT/min
Mittwoch, 20. März 2019
08:28
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m63_cros_plu_emp_80deg_Hloop_down_Parallel_20190320_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_2.dat>> <<m63_cros_plu_emp_80deg_Hloop_up_Parallel_20190320_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_2.dat>> |
![000
09Z
009
冖 。 0 • 08 一 dwe¯nld¯SOJ0 9LAJ
098
w]
0
098 |
冖 pell!J) … SéSSOJO
(P911!J) I-IMOO :sessnld
冖 pell!J) d n … SéSSOJO
冖 P911!J) dn :sessnld
009 |
09Z |
000 ㄒ
09 • 0
940
0q0
09 • 0 丨
GL 0 ,
00 · ㄒ
94 ㄒ](Angles_Hloops-Dateien/image1471.gif)
C:
Changing angle 75
Mittwoch, 20. März 2019
08:29
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
VH
measured before changing the angle: 1.948mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
![]()
Mittwoch, 20. März 2019
08:32
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m64_Plusses_75deg_Hloop_up__Gradio_20190320_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.6kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V.dat>> <<m64_Plusses_75deg_Hloop_down__Gradio_20190320_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.6kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V.dat>> |
R12=
72/1000*50 = 3,6

![]()
Mittwoch, 20. März 2019
14:48
(1) Structures
measured
|
Crosses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m65_Crosses_75deg_Hloop_up__Gradio_20190320_1430_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V.dat>> <<m65_Crosses_75deg_Hloop_down__Gradio_20190320_1430_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V.dat>> |
R12
= 65/1000*50 = 3,25

m66:
Plusses_Crosses_empty_Hloop_75deg_500mT/min
Mittwoch, 20. März 2019
19:22
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m66_cros_plu_emp_75deg_Hloop_down_Parallel_20190320_1900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_2.dat>> <<m66_cros_plu_emp_75deg_Hloop_up_Parallel_20190320_1900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_2.dat>> |

C:
Changing angle 70
Mittwoch, 20. März 2019
19:28
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
VH
measured before changing the angle: 2.886mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
![]()
Mittwoch, 20. März 2019
20:02
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m67_Plusses_70deg_Hloop_down__Gradio_20190320_2000_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> <<m67_Plusses_70deg_Hloop_up__Gradio_20190320_2000_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> |
R12=
103/1000*50 = 5,15

![]()
Donnerstag, 21. März 2019
07:11
(1) Structures
measured
|
Crosses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m68_Crosses_70deg_Hloop_up__Gradio_20190321_0700_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> <<m68_Crosses_70deg_Hloop_down__Gradio_20190321_0700_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V.dat>> |
R12
= 70/1000*50 = 3,5

m69:
Plusses_Crosses_empty_Hloop_70deg_1T/min
Mittwoch, 20. März 2019
19:22
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m69_cros_plu_emp_70deg_Hloop_down_Parallel_20190321_1200_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V.dat>> <<m69_cros_plu_emp_70deg_Hloop_up_Parallel_20190321_1200_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V.dat>> |

C:
Changing angle 65
Donnerstag, 21. März 2019
12:16
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
![]()
Donnerstag, 21. März 2019
12:15
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m70_Plusses_65deg_Hloop_down__Gradio_20190321_1200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V.dat>> <<m70_Plusses_65deg_Hloop_up__Gradio_20190321_1200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V.dat>> |
R12=
103/1000*50 = 5,15

![]()
Donnerstag, 21. März 2019
18:50
(1) Structures
measured
|
Crosses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m71_Crosses_65deg_Hloop_down__Gradio_20190321_1900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-1.3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.75T_gate-0V.dat>> <<m71_Crosses_65deg_Hloop_up__Gradio_20190321_1900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-1.3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.75T_gate-0V.dat>> |
R12
= 26/1000*50 = 1,3

m72:
Plusses_Crosses_empty_Hloop_65deg_1T/min
Freitag, 22. März 2019
07:39
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m72_cros_plu_emp_65deg_Hloop_up_Parallel_20190322_0700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<m72_cros_plu_emp_65deg_Hloop_down_Parallel_20190322_0700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |

C:
Changing angle 60
Freitag, 22. März 2019
12:16
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
VH
before changing the angle: 4.706mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
![]()
Freitag, 22. März 2019
08:11
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m73_Plusses_60deg_Hloop_up__Gradio_20190322_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.1kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.7T_gate-0V.dat>> <<m73_Plusses_60deg_Hloop_down__Gradio_20190322_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.1kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.7T_gate-0V.dat>> |
R12=
62/1000*50 = 3,1

![]()
Freitag, 22. März 2019
13:52
(1) Structures
measured
|
Crosses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m74_Crosses_60deg_Hloop_down__Gradio_20190322_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.8kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.6T_gate-0V.dat>> <<m74_Crosses_60deg_Hloop_up__Gradio_20190322_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.8kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.6T_gate-0V.dat>> |
R12
= 56/1000*50 = 2,8

m75:
Plusses_Crosses_empty_Hloop_60deg_1T/min
Freitag, 22. März 2019
18:16
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m75_cros_plu_emp_60deg_Hloop_down_Parallel_20190322_1800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<m75_cros_plu_emp_60deg_Hloop_up_Parallel_20190322_1800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |

C:
Changing angle 55
Freitag, 22. März 2019
18:17
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
VH
before changing the angle: 5,561mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
![]()
Freitag, 22. März 2019
18:35
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m76_Plusses_55deg_Hloop_down__Gradio_20190322_1900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-4.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V.dat>> <<m76_Plusses_55deg_Hloop_up__Gradio_20190322_1900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-4.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V.dat>> |
R12=
95/1000*50 = 4,75

![]()
Freitag, 22. März 2019
22:11
(1) Structures
measured
|
Crosses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m77_Crosses_55deg_Hloop_down__Gradio_20190322_2200_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.65kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.6T_gate-0V.dat>> <<m77_Crosses_55deg_Hloop_up__Gradio_20190322_2200_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.65kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.6T_gate-0V.dat>> |
R12
= 53/1000*50 = 2,65
I have realized that there is a problem with
the cables of current I1. I did change them and everything was fine.

M78:
Plusses_Crosses_empty_Hloop_55deg_1T/min
Samstag, 23. März 2019
09:09
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m78_cros_plu_emp_55deg_Hloop_up_Parallel_20190323_0900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<m78_cros_plu_emp_55deg_Hloop_down_Parallel_20190323_0900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |

C:
Changing angle 50
Samstag, 23. März 2019
09:09
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
VH
before changing the angle: 6.429mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
![]()
Samstag, 23. März 2019
09:15
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m79_Plusses_50deg_Hloop_down__Gradio_20190323_0900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-6.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.4T_gate-0V_down.dat>> <<m79_Plusses_50deg_Hloop_up_Gradio_20190323_0900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-6.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.4T_gate-0V_up.dat>> |
R12=
135/1000*50 = 6,75

![]()
Samstag, 23. März 2019
12:38
(1) Structures
measured
|
Crosses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m80_Crosses_50deg_Hloop_down__Gradio_20190323_1200_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.4T_gate-0V.dat>> <<m80_Crosses_50deg_Hloop_up__Gradio_20190323_1200_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.4T_gate-0V.dat>> |
R12
= 120/1000*50 = 6

m81:
Plusses_Crosses_empty_Hloop_50deg_1T/min
Samstag, 23. März 2019
15:31
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m81_cros_plu_emp_50deg_Hloop_up_Parallel_20190323_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<m81_cros_plu_emp_50deg_Hloop_down_Parallel_20190323_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |

C:
Changing angle 95
Samstag, 23. März 2019
15:35
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
VH
before changing the angle: 7.166mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()

Samstag, 23. März 2019
16:11
(1) Structures
measured
|
Plusses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m82_Plusses_95deg_Hloop_down__Gradio_20190323_1600_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-6.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_down_.dat>> <<m82_Plusses_95deg_Hloop_up__Gradio_20190323_1600_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-6.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_up_.dat>> |
R12=
125/1000*50 = 6,25


Samstag, 23. März 2019
00:01
(1) Structures
measured
|
Crosses |
||||||||||||||||||
|
(2) Measurement type |
Hloop_gradiometry |
||||||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||||||
|
(4) Magnet Setup: |
|
||||||||||||||||||
|
(5) Experiment Setup: |
|
||||||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||||||
|
(7) Important Notes: |
|
||||||||||||||||||
|
(8) Filename and data: |
<<m83_Crosses_95deg_Hloop_up__Gradio_20190324_0000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V.dat>> <<m83_Crosses_95deg_Hloop_down__Gradio_20190324_0000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V.dat>> |
R12
= 40/1000*50 = 2

m84:
Plusses_Crosses_empty_Hloop_95deg_1T/min
Sonntag, 24. März 2019
08:18
(1) Structures measured
|
Plusses_Crosses_empty |
|||||||||||||||
(2) Measurement type
|
Hloop_parallel |
|||||||||||||||
|
(3) Cables Setup: |
|
|||||||||||||||
|
(4) Magnet Setup: |
|
|||||||||||||||
|
(5) Experiment
Setup: |
|
|||||||||||||||
|
(6) Lock-In Setup: |
|
|||||||||||||||
|
(7) Important Notes: |
|
|||||||||||||||
|
(8) Filename and
data: |
<<m84_cros_plu_emp_95deg_Hloop_down_Parallel_20190324_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> <<m84_cros_plu_emp_95deg_Hloop_up_Parallel_20190324_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> |

C:
Changing angle 100
Sonntag, 24. März 2019
08:20
(1) Structures measured
|
Empty
Cross |
||||||||||||||
(2) Measurement type
|
Angle Changing |
||||||||||||||
|
(3) Cables Setup: |
|
||||||||||||||
|
(4) Magnet Setup: |
B
= 1 T |
||||||||||||||
|
(5) Experiment
Setup: |
|
||||||||||||||
|
(6) Lock-In Setup: |
|
||||||||||||||
|
(7) Important Notes: |
VH
before changing the angle: -1.075mV |
||||||||||||||
|
(8) Filename and
data: |
No
File created |
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
m85: Plusses_Hloop_100deg
Sonntag, 24. März 2019
08:30
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 105/1000*50 = 5,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m85_Plusses_100deg_Hloop_up__Gradio_20190324_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-5.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_up_.dat>> <<m85_Plusses_100deg_Hloop_down__Gradio_20190324_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-5.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_down_.dat>> |
||||
|
|
m86:Crosses_Hloop_100deg
24/03/2019 17:49
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 45/1000*50 = 2,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m86_Crosses_100deg_Hloop_down__Gradio_20190324_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V.dat>> <<m86_Crosses_100deg_Hloop_up_Gradio_20190324_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V.dat>> |
||||
|
|
m87: PlussesCrossesEmpty_Parallel Hloop_100deg
Sonntag, 24. März 2019
19:24
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m87_cros_plu_emp_100deg_Hloop_down_Parallel_20190324_1900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> <<m87_cros_plu_emp_100deg_Hloop_up_Parallel_20190324_1900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> |
||||
|
|
C: Changing angle 105
Sonntag, 24. März 2019
19:26
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(105)*11,164 =
-2,889455819524543 Cos(0)=1 Before changing: -1.906mV Measured: -2.888mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m88: Plusses_Hloop_105deg
Sonntag, 24. März 2019
20:33

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 52/1000*50 = 2,6 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m88_Plusses_105deg_Hloop_down__Gradio_20190324_2000_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-2.6kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V_down_.dat>> <<m88_Plusses_105deg_Hloop_up__Gradio_20190324_2000_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-2.6kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V_up_.dat>> |
||||
|
|
m89: Crosses_Hloop_105deg
Montag, 25. März 2019
08:10
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 28/1000*50 = 1,4 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m89_Crosses_105deg_Hloop_down__Gradio_20190325_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-1.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_down_.dat>> <<m89_Crosses_105deg_Hloop_up__Gradio_20190325_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R1-1.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_up_.dat>> |
||||
|
|
m90: PlussesCrossesEmpty_Parallel Hloop_105deg
Montag, 25. März 2019
13:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m90_cros_plu_emp_100deg_Hloop_down_Parallel_20190325_1300_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> <<m90_cros_plu_emp_100deg_Hloop_up_Parallel_20190325_1300_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> |
||||
|
|
C: Changing angle 110
Montag, 25. März 2019
13:48
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(110)*11,164 =
-3,818312880087765 Cos(0)=1 Before changing: -1.906mV Measured: -3.817mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m91: Plusses_Hloop_110deg
19 March 2019
08:49

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 103/1000*50 = 5,15 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m91_Plusses_110deg_Hloop_down__Gradio_20190325_1400_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.6T_gate-0V_down_.dat>> <<m91_Plusses_110deg_Hloop_up__Gradio_20190325_1400_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5.15kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.6T_gate-0V_up_.dat>> |
||||
|
|
m92: Crosses_Hloop_110deg_overload
repeated at 22:00 :( check m93
Montag, 25. März 2019
18:30
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 45/1000*50 = 2,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m92_Crosses_110deg_Hloop_down__Gradio_20190325_1800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_down_.dat>> <<m92_Crosses_110deg_Hloop_up__Gradio_20190325_1800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_up_.dat>> |
||||
|
|
m93: Crosses_Hloop_110deg
Montag, 25. März 2019
22:20
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 45/1000*50 = 2,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m93_Crosses_110deg_Hloop_down__Gradio_20190325_2200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V_down_.dat>> <<m93_Crosses_110deg_Hloop_up__Gradio_20190325_2200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-0.5T_gate-0V_up_.dat>> |
||||
|
|
M94: PlussesCrossesEmpty_Parallel Hloop_110deg
Dienstag, 26. März 2019
07:26
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m94_cros_plu_emp_100deg_Hloop_down_Parallel_20190326_0700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> <<m94_cros_plu_emp_100deg_Hloop_up_Parallel_20190326_0700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> |
||||
|
|
:
Negative angles

|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
C: Changing angle (-5 )
Dienstag, 26. März 2019
08:46
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(-5)*11,164 =
11,12151760949625 Before changing: Measured:11.121mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m95: Plusses_Hloop_(-5) deg
Dienstag, 26. März 2019
08:58

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 73/1000*50 = 3,65 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m95_Plusses_neg5deg_Hloop_down__Gradio_20190326_0900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.65kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_down_.dat>> <<m95_Plusses_neg5deg_Hloop_up__Gradio_20190326_0900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.65kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_up_.dat>> |
||||
|
|
m96: Crosses_Hloop_(-5)deg
Dienstag, 26. März 2019
14:39
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 65/1000*50 = 3,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m96_Crosses_-5deg_Hloop_down__Gradio_20190326_1400_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.4T_gate-0V_down_.dat>> <<m96_Crosses_-5deg_Hloop_up__Gradio_20190326_1400_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.4T_gate-0V_up_.dat>> |
||||
|
|
m97: PlussesCrossesEmpty_Parallel Hloop_(-5)deg
Dienstag, 26. März 2019
17:29
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m97_cros_plu_emp_-5deg_Hloop_down_Parallel_20190326_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V__.dat>> <<m97_cros_plu_emp_-5deg_Hloop_up_Parallel_20190326_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V__.dat>> |
||||
|
|
C: Changing angle (-10)
19 March 2019
08:49
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(-10)*11,164 =
10,99439375462829 Before changing: 10,4 Measured:10,992 |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m98: Plusses_Hloop_(-10)deg
19 March 2019
08:49

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 155/1000*50 = 7,75 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m98_Plusses_-10deg_Hloop_up__Gradio_20190326_1700_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_up_A__.dat>> <<m98_Plusses_-10deg_Hloop_up__Gradio_20190326_1700_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_up_B__.dat>> |
||||
|
|
m99: Crosses_Hloop_(-10)deg
Dienstag, 26. März 2019
21:07
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 128/1000*50 = 6,4 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m99_Crosses_-10deg_Hloop_down__Gradio_20190326_2100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_down_.dat>> <<m99_Crosses_-10deg_Hloop_up__Gradio_20190326_2100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_up_.dat>> |
||||
|
|
m100: PlussesCrossesEmpty_Parallel Hloop_(-10)deg
Mittwoch, 27. März 2019
07:47
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m100_cros_plu_emp_-10deg_Hloop_down_Parallel_20190327_0700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> <<m100_cros_plu_emp_-10deg_Hloop_up_Parallel_20190327_0700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> |
||||
|
|
C: Changing angle (-15)
Mittwoch, 27. März 2019
07:55
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(-15)*11,164 = 10,78359592469116 Before changing:10.568 Measured:10.783mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m101: Plusses_Hloop_(-15)deg
Mittwoch, 27. März 2019
07:55

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
176/1000*50=8,8 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m101_Plusses_-15deg_Hloop_down__Gradio_20190327_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.8kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m101_Plusses_-15deg_Hloop_up__Gradio_20190327_0800_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.8kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m102: Crosses_Hloop_(-15)deg
Mittwoch, 27. März 2019
08:49
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 164/1000*50 = 8,2 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m102_Crosses_-15deg_Hloop_down__Gradio_20190327_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.2kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m102_Crosses_-15deg_Hloop_up__Gradio_20190327_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.2kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m103: PlussesCrossesEmpty_Parallel Hloop_(-15)deg
Mittwoch, 27. März 2019
12:23
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m103_cros_plu_emp_-15deg_Hloop_up_Parallel_20190327_1200_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> <<m103_cros_plu_emp_-15deg_Hloop_down_Parallel_20190327_1200_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> |
||||
|
|
C: Changing angle (-20)
Mittwoch, 27. März 2019
12:23
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(-20)*11,164 =
10,49072841845388 Before changing:10,738 Measured:10,492 |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m104: Plusses_Hloop_(-20)deg
Mittwoch, 27. März 2019
12:23

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 200/1000*50 = 10 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m104_Plusses_-20deg_Hloop_down__Gradio_20190327_1200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-10kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m104_Plusses_-20deg_Hloop_up__Gradio_20190327_1200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-10kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m105: Crosses_Hloop_(-20)deg
Mittwoch, 27. März 2019
14:14
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 173/1000*50 = 8,65 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m105_Crosses_-20deg_Hloop_down__Gradio_20190327_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.65kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m105_Crosses_-20deg_Hloop_up__Gradio_20190327_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.65kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m106: PlussesCrossesEmpty_Parallel Hloop_(-20)deg
19 March 2019
08:49
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m106_cros_plu_emp_-20deg_Hloop_up_Parallel_20190327_1600_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> <<m106_cros_plu_emp_-20deg_Hloop_down_Parallel_20190327_1600_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> |
||||
|
|
C: Changing angle (-25)
Mittwoch, 27. März 2019
16:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(-25)*11,164 =
10,11802013447716 Before changing:10,43 mV Measured: 10,119 mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m107: Plusses_Hloop_(-25)deg
Mittwoch, 27. März 2019
17:00

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 200/1000*50 = 10 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m107_Plusses_-25deg_Hloop_up__Gradio_20190327_1630_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> <<m107_Plusses_-25deg_Hloop_down__Gradio_20190327_1630_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_down__.dat>> |
||||
|
|
m108: Crosses_Hloop_(-25)deg
Mittwoch, 27. März 2019
19:32
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 175/1000*50 = 8,75 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m108_Crosses_-25deg_Hloop_down__Gradio_20190327_1900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m108_Crosses_-25deg_Hloop_up__Gradio_20190327_1900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m109: PlussesCrossesEmpty_Parallel Hloop_(-25)deg
Mittwoch, 27. März 2019
21:24
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m109_cros_plu_emp_-25deg_Hloop_down_Parallel_20190327_2100_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> <<m109_cros_plu_emp_-25deg_Hloop_up_Parallel_20190327_2100_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> |
||||
|
|
C: Changing angle (-30)
Mittwoch, 27. März 2019
21:26
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(-30)*11,164 =
9,668307607849474 Before changing:10.118 Measured:9.669mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m110: Plusses_Hloop_(-30)deg
Mittwoch, 27. März 2019
21:36

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 188/1000*50 = 9,4 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m110_Plusses_-30deg_Hloop_down__Gradio_20190327_2130_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m110_Plusses_-30deg_Hloop_up__Gradio_20190327_2130_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m111: Crosses_Hloop_(-30)deg
Donnerstag, 28. März 2019
07:13
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 175/1000*50 = 8,75 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m111_Crosses_-30deg_Hloop_down__Gradio_20190328_0700_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m111_Crosses_-30deg_Hloop_up__Gradio_20190328_0700_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m112: PlussesCrossesEmpty_Parallel Hloop_(-30)deg
Donnerstag, 28. März 2019
08:30
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m112_cros_plu_emp_-30deg_Hloop_down_Parallel_20190328_0900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V__a.dat>> <<m112_cros_plu_emp_-30deg_Hloop_up_Parallel_20190328_0900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V__a.dat>> |
||||
|
|
C: Changing angle (-35)
Donnerstag, 28. März 2019
09:13
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(-35)*11,164
= 9,145013422442304 Before changing: 9.500mV Measured:9.145mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m113: Plusses_Hloop_(-35)deg
Donnerstag, 28. März 2019
09:13

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 191/1000*50 = 9,55 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m113_Plusses_-35deg_Hloop_down__Gradio_20190328_0900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.55kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m113_Plusses_-35deg_Hloop_up__Gradio_20190328_0900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.55kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m114: Crosses_Hloop_(-35)deg
Donnerstag, 28. März 2019
11:09
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 180/1000*50 = 9 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m114_Crosses_-35deg_Hloop_down__Gradio_20190328_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m114_Crosses_-35deg_Hloop_up__Gradio_20190328_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
---------------
Testing Noise Measurements ---------------

Test
Files:
·
174
·
175
![100
10
0.01
0.001
Test174 (Vx)
10
Frequenz [Hz]](Angles_Hloops-Dateien/image2160.jpg)
![Testi 75 (Vx)
vy
o.ooı
10
Frequenz [Hz]](Angles_Hloops-Dateien/image2162.jpg)
m115: PlussesCrossesEmpty_Parallel Hloop_(-35)deg
Donnerstag, 28. März 2019
08:49
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m115_cros_plu_emp_-35deg_Hloop_down_Parallel_20190328_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V____.dat>> <<m115_cros_plu_emp_-35deg_Hloop_up_Parallel_20190328_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V____.dat>> |
||||
|
|
C: Changing angle (-40)_after testing the
noise measurement setup ??? check later angle 45° to see the right VH(7.515mV)
Donnerstag, 28. März 2019
15:45
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164 |
||
|
V_H= Cos(-40)*11,164
= 8,55212016298027 Before changing: 10.940mV ?????? check it? it has been changed after doing noise
measurement Measured: 8,551 mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m116: Plusses_Hloop_(-40)deg~[47.69°]
Donnerstag, 28. März 2019
15:45

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 156/1000*50 = 7,8 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m116_Plusses_-40deg_Hloop_up__Gradio_20190328_1600_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.8kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_up__.dat>> <<m116_Plusses_-40deg_Hloop_down__Gradio_20190328_1600_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.8kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_down__.dat>> |
||||
|
|
m117: Crosses_Hloop_(-40)deg~[47.69°]
Donnerstag, 28. März 2019
19:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 128/1000*50 = 6,4 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m117_Crosses_-40deg_Hloop_down__Gradio_20190328_1900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_down_after noise test_.dat>> <<m117_Crosses_-40deg_Hloop_up__Gradio_20190328_1900_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.3T_gate-0V_up_after noise test_.dat>> |
||||
|
|
m118: PlussesCrossesEmpty_Parallel Hloop_(-40)deg~[47.69°]
Freitag, 29. März 2019
07:12
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m118_cros_plu_emp_-40deg_Hloop_up_Parallel_20190329_0700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V____.dat>> <<m118_cros_plu_emp_-40deg_Hloop_down_Parallel_20190329_0700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V____.dat>> |
||||
|
|
C: Changing angle (-45)deg_look at VH
Freitag, 29. März 2019
07:14
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-45)*11,164
= 7,894140105166617 Before changing the angle: 7.515mV.
Note this VH might refer to 47.69° Measured: 7.895mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m119: Plusses_Hloop_(-45)deg
Freitag, 29. März 2019
07:17

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 198/1000*50 = 9,9 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m119_Plusses_-45deg_Hloop_up__Gradio_20190329_0700_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> <<m119_Plusses_-45deg_Hloop_down__Gradio_20190329_0700_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.9kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> |
||||
|
|
m120: Crosses_Hloop_(-45)deg
Freitag, 29. März 2019
10:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 210/1000*50 = 10,5 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m120_Crosses_-45deg_Hloop_up__Gradio_20190329_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-10.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up_.dat>> <<m120_Crosses_-45deg_Hloop_down__Gradio_20190329_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-10.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down_.dat>> |
||||
|
|
m121: PlussesCrossesEmpty_Parallel Hloop_(-45)deg
Freitag, 29. März 2019
11:58
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m121_cros_plu_emp_-45deg_Hloop_down_Parallel_20190329_1200_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_a.dat>> <<m121_cros_plu_emp_-45deg_Hloop_up_Parallel_20190329_1200_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_a.dat>> |
||||
|
|
C: Changing angle (-50)
Freitag, 29. März 2019
08:49
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-50)*11,164
= 7,176080874540525mV Before changing: 7,834 mV Measured: 7,175 mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m122: Plusses_Hloop_(-50)deg
Freitag, 29. März 2019
12:00

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 245/1000*50 = 12,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m122_Plusses_-50deg_Hloop_down__Gradio_20190329_1200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-12.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.2T_gate-0V_down__.dat>> <<m122_Plusses_-50deg_Hloop_up__Gradio_20190329_1200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-12.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.2T_gate-0V_up__.dat>> |
||||
|
|
m123: Crosses_Hloop_deg(-50)deg
Dienstag, 19. März 2019
13:47
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 245/1000*50 = 12,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m123_Crosses_-50deg_Hloop_down__Gradio_20190329_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-12.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.2T_gate-0V_down_.dat>> <<m123_Crosses_-50deg_Hloop_up__Gradio_20190329_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-12.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.2T_gate-0V_up_.dat>> |
||||
|
|
m124: PlussesCrossesEmpty_Parallel Hloop_(-50)deg
Freitag, 29. März 2019
17:30
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m124_cros_plu_emp_-50deg_Hloop_up_Parallel_20190329_1600_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V.dat>> <<m124_cros_plu_emp_-50deg_Hloop_down_Parallel_20190329_1600_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V.dat>> |
||||
|
|
C: Changing angle (-55)
Freitag, 29. März 2019
17:30
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-55)*11,164
= 6,40340733542308 Before changing: 7,165 mV Measured: 6,4025 mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m125: Plusses_Hloop_(-55)deg
Freitag, 29. März 2019
17:30

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 370/1000*50 = 18,5 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m125_Plusses_-55deg_Hloop_down__Gradio_20190328_1600_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-18.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m125_Plusses_-55deg_Hloop_up__Gradio_20190328_1600_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-18.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m126: Crosses_Hloop_(-55)deg
Freitag, 29. März 2019
17:30
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 370/1000*50 = 18,5 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m126_Crosses_-55deg_Hloop_down__Gradio_20190328_1700_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-18.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.15T_gate-0V_down__.dat>> <<m126_Crosses_-55deg_Hloop_up__Gradio_20190328_1700_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-18.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.15T_gate-0V_up__.dat>> |
||||
|
|
m127: PlussesCrossesEmpty_Parallel Hloop_(-55)deg
Freitag, 29. März 2019
18:43
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m127_cros_plu_emp_-55deg_Hloop_down_Parallel_20190329_1900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<m127_cros_plu_emp_-55deg_Hloop_up_Parallel_20190329_1900_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |
||||
|
|
C: Changing angle (-60)
Freitag, 29. März 2019
18:46
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-60)*11,164
= 5,582000000000001 Before changing:6.372mv Measured:5.581mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m128: Plusses_Hloop_deg(-60)
Freitag, 29. März 2019
18:47

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 =235/1000*50=11.75 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m128_Plusses_-60deg_Hloop_up__Gradio_20190329_1900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-11.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up_.dat>> <<m128_Plusses_-60deg_Hloop_down__Gradio_20190329_1900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-11.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> |
||||
|
|
m129: Crosses_Hloop_deg(-60)
Freitag, 29. März 2019
08:49
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 220/1000*50 = 11 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m129_Crosses_-60deg_Hloop_down__Gradio_20190329_2100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-11kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_down__.dat>> <<m129_Crosses_-60deg_Hloop_up__Gradio_20190329_2100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-11kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.25T_gate-0V_up__.dat>> |
||||
|
|
m130: PlussesCrossesEmpty_Parallel Hloop_(-60)deg
Samstag, 30. März 2019
08:39
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m130_cros_plu_emp_-60deg_Hloop_down_Parallel_20190330_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> <<m130_cros_plu_emp_-60deg_Hloop_up_Parallel_20190330_0800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V_.dat>> |
||||
|
|
C: Changing angle (-65)
Samstag, 30. März 2019
08:40
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-65)*11,164
= 4,718110274073169 Before
changing: 5.436mV Measured:4.719mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m131: Plusses_Hloop_(-65)deg
Samstag, 30. März 2019
08:51

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 165/1000*50 = 8,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m131_Plusses_-65deg_Hloop_down__Gradio_20190330_0900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.35T_gate-0V_down__.dat>> <<m131_Plusses_-65deg_Hloop_up__Gradio_20190330_0900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.35T_gate-0V_up__.dat>> |
||||
|
|
m132: Crosses_Hloop_(-65)deg
Samstag, 30. März 2019
11:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 135/1000*50 = 6,75 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m132_Crosses_-65deg_Hloop_down__Gradio_20190330_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.35T_gate-0V_down__.dat>> <<m132_Crosses_-65deg_Hloop_up__Gradio_20190330_1100_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.35T_gate-0V_up__.dat>> |
||||
|
|
m133: PlussesCrossesEmpty_Parallel Hloop_(-65)deg
Samstag, 30. März 2019
15:09
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m133_cros_plu_emp_-65deg_Hloop_down_Parallel_20190330_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V__.dat>> <<m133_cros_plu_emp_-65deg_Hloop_up_Parallel_20190330_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-0.5-T-min_B-1T_gate-0V__.dat>> |
||||
|
|
C: Changing angle (-70)
Samstag, 30. März 2019
15:09
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-70)*11,164
= 3,818312880087767 mv Before changing:4.712mV Measured: 3.816mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m134: Plusses_Hloop_deg(-70)
Samstag, 30. März 2019
15:10

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 188/1000*50 = 9,4 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m134_Plusses_-70deg_Hloop_up__Gradio_20190330_1500_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.35T_gate-0V_up__.dat>> <<m134_Plusses_-70deg_Hloop_down__Gradio_20190330_1500_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-9.4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.35T_gate-0V_down__.dat>> |
||||
|
|
m135: Crosses_Hloop_deg(-70)
Dienstag, 2. April 2019
12:30
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 130/1000*50 = 6,5 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m135_Crosses_-70deg_Hloop_down__Gradio_20190402_1200_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.35T_gate-0V_down__.dat>> <<m135_Crosses_-70deg_Hloop_up__Gradio_20190402_1200_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.35T_gate-0V_up__.dat>> |
||||
|
|
m136: Crosses_Hloop_deg(-70) repeat
\w 0.5T
Dienstag, 2. April 2019
12:30
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 130/1000*50 = 6,5 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m136_Crosses_-70deg_Hloop_down__Gradio_20190402_1500_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_down__.dat>> <<m136_Crosses_-70deg_Hloop_up__Gradio_20190402_1500_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-6.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_up__.dat>> |
||||
|
|
m137: PlussesCrossesEmpty_Parallel Hloop_(-70)deg
Dienstag, 2. April 2019
19:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m137_cros_plu_emp_-70deg_Hloop_down_Parallel_20190402_1800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> <<m137_cros_plu_emp_-70deg_Hloop_up_Parallel_20190402_1800_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> |
||||
|
|
C: Changing angle (-75)
Dienstag, 2. April 2019
19:01
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-75)*11,164
= 2,889455819524541 Before changing: 3,868 mV Measured: 2,8886 mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m138: Plusses_Hloop_(-75)deg
Dienstag, 2. April 2019
19:01

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = 2 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m138_Plusses_-75deg_Hloop_down__Gradio_20190402_1900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V_down__.dat>> <<m138_Plusses_-75deg_Hloop_up__Gradio_20190402_1900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-2kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-1T_gate-0V_up__.dat>> |
||||
|
|
m139: Crosses_Hloop_(-75)deg
Mittwoch, 3. April 2019
10:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 60/1000*50 = 3 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m139_Crosses_-75deg_Hloop_down__Gradio_20190403_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_down__.dat>> <<m139_Crosses_-75deg_Hloop_up__Gradio_20190403_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_up__.dat>> |
||||
|
|
m140: Crosses_Hloop_(-75)deg again
Mittwoch, 3. April 2019
17:20
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 60/1000*50 = 3 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m140_Crosses_-75deg_Hloop_down__Gradio_20190403_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_down__.dat>> <<m140_Crosses_-75deg_Hloop_up__Gradio_20190403_1400_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_up__.dat>> |
||||
|
|
139-140
comparison
Samstag, 6. April 2019
10:02

m141: PlussesCrossesEmpty_Parallel Hloop_(-75)deg
Mittwoch, 3. April 2019
17:24
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m141_cros_plu_emp_-75deg_Hloop_up_Parallel_20190403_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> <<m141_cros_plu_emp_-75deg_Hloop_down_Parallel_20190403_1700_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> |
||||
|
|
C: Changing angle (-40) again
Mittwoch, 3. April 2019
17:25
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-40)*11,164
= 8,55212016298027 Before changing: 2,818 mV Measured: 8.555 mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m142: PlussesCrossesEmpty_Parallel Hloop_(-40)deg
Mittwoch, 3. April 2019
18:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m142_cros_plu_emp_-40deg_Hloop_up_Parallel_20190403_1730_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> <<m142_cros_plu_emp_-40deg_Hloop_down_Parallel_20190403_1730_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> |
||||
|
|
m143: Plusses_Hloop_(-40)deg
Mittwoch, 3. April 2019
19:00

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 60/1000*50 = 3 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m143_Plusses_-40deg_Hloop_up__Gradio_20190403_1900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V_up__.dat>> |
||||
|
|
<<m143_Plusses_-40deg_Hloop_down__Gradio_20190403_1900_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V_down__.dat>>
m144: Plusses_Hloop_(-40)deg repeated for comparison

Mittwoch, 3. April 2019
19:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 60/1000*50 = 3 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m144_Plusses_-40deg_Hloop_up__Gradio_20190404_0200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V_up__.dat>> <<m144_Plusses_-40deg_Hloop_down__Gradio_20190404_0200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.008-T-min_B-1T_gate-0V_down__.dat>> |
||||
|
|
![Computergenerierter Alternativtext:
Difference m143 - m144 (40 0 )
A up
A down
0.2
-0.6
-100
-75
-50
o H ext [ m T]
50
75
100](Angles_Hloops-Dateien/image2375.gif)
143-144
comparison
07 April 2019
13:19
<<-40deg_Hloops_2run_plusses.pdf>>
m145: Crosses_Hloop_(-40)deg
Donnerstag, 4. April 2019
10:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 100/1000*50 = 5 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m145_Crosses_-40deg_Hloop_down__Gradio_20190404_1300_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.4T_gate-0V_down__.dat>> <<m145_Crosses_-40deg_Hloop_up__Gradio_20190404_1300_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.4T_gate-0V_up__.dat>> |
||||
|
|
m146: PlussesCrossesEmpty_Parallel Hloop_(-40)deg
19 March 2019
08:49
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m146_cros_plu_emp_-40deg_Hloop_down_Parallel_20190404_1600_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> <<m146_cros_plu_emp_-40deg_Hloop_up_Parallel_20190404_1600_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> |
||||
|
|
C: Changing angle (-80)
Samstag, 6. April 2019
09:53
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-80)*11,164
= 1,938608255473611 Before changing: 8.439mV Measured: 1.938mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m147: Plusses_Hloop_(-80)deg
Samstag, 6. April 2019
10:09

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 165/1000*50 = 8,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m147_Plusses_-80deg_Hloop_up__Gradio_20190406_1000_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_up__.dat>> <<m147_Plusses_-80deg_Hloop_down__Gradio_20190406_1000_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_down__.dat>> |
||||
|
|
m148: Plusses_Hloop_(-80)deg_repeated for comparison

Samstag, 6. April 2019
10:09
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 165/1000*50 = 8,25 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m148_Plusses_-80deg(rep. for compar)_Hloop_up__Gradio_20190406_1200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_up__.dat>> <<m148_Plusses_-80deg(rep. for compar)_Hloop_down__Gradio_20190406_1200_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-8.25kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_down__.dat>> |
||||
|
|
147-148comparison
Samstag, 6. April 2019
10:02

m149: Crosses_Hloop_(-80)deg
Samstag, 6. April 2019
17:30
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 75/1000*50 = 3,75 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m149_Crosses_-80deg_Hloop_down__Gradio_20190406_17000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_down__.dat>> <<m149_Crosses_-80deg_Hloop_up__Gradio_20190406_17000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_up__.dat>> |
||||
|
|
m150: Crosses_Hloop_(-80)deg_repeated for
comparison
Samstag, 6. April 2019
20:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m150_Crosses_-80deg(rep. for compar)_Hloop_down__Gradio_20190406_17000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_down__.dat>> <<m150_Crosses_-80deg(rep. for compar)_Hloop_up__Gradio_20190406_17000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-3.75kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.5T_gate-0V_up__.dat>> |
||||
|
|
149-150comparison
Samstag, 6. April 2019
10:02

m151: PlussesCrossesEmpty_Parallel Hloop_(-80)deg
Sonntag, 7. April 2019
01:12
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m151_cros_plu_emp_-80deg_Hloop_down_Parallel_20190407_0100_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> <<m151_cros_plu_emp_-80deg_Hloop_up_Parallel_20190407_0100_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V.dat>> |
||||
|
|
C: Changing angle (-85)_midnight
Sonntag, 7. April 2019
01:19
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-85)*11,164
= 0,973006712034855 Before changing: 2.004mV Measured:0.973mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m152: Plusses_Hloop_(-85)deg_1am
morning
Sonntag, 7. April 2019
01:34

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 150/1000*50 = 7,5 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m152_Plusses_-85deg_Hloop_down__Gradio_20190407_0133_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_down__.dat>> <<m152_Plusses_-85deg_Hloop_up__Gradio_20190407_0133_I1-1-13_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-7.5kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_up__.dat>> |
||||
|
|
m153: Crosses_Hloop_(-85)deg
Sonntag, 7. April 2019
10:01
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 80/1000*50 = 4 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m153_Crosses_-85deg_Hloop_down__Gradio_20190407_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_down__.dat>> <<m153_Crosses_-85deg_Hloop_up__Gradio_20190407_1000_I1-2-12_I2-8-6_GBIP8-14-7_Vin-2.5V_R11-1MO_R12-4kO_R13-0_R21-1MO_C11-1_C21-6_T-30K_SR-0.01-T-min_B-0.75T_gate-0V_up__.dat>> |
||||
|
|
m154: PlussesCrossesEmpty_Parallel Hloop_(-85)deg
Sonntag, 7. April 2019
15:12
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m154_cros_plu_emp_-85deg_Hloop_down_Parallel_20190407_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> <<m154_cros_plu_emp_-85deg_Hloop_up_Parallel_20190407_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-1-T-min_B-1T_gate-0V_.dat>> |
||||
|
|
C: Changing angle (-90)
Sonntag, 7. April 2019
22:15
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
VH(max)
(mV) |
11,164mV |
||
|
V_H= Cos(-90)*11,164
= 0 Before changing:0.9878mv Measured: -0.0009mV |
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
||
|
|
||
|
|
||
|
|
m155: PlussesCrossesEmpty_Parallel
Hloop_(-90)deg_10mT/min
Sonntag, 7. April 2019
22:15
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
<<m155_cros_plu_emp_-90deg_Hloop_up_Parallel_20190407_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-10-T-min_B-1T_gate-0V_b_.dat>> <<m155_cros_plu_emp_-90deg_Hloop_down_Parallel_20190407_1500_I-7-14_GB8-1-13_GB9-2-12_GB13-6-8_Vin-2.5V_R11-1MO_C11-1_C21-6_T-30K_SR-10-T-min_B-1T_gate-0V_a_.dat>> |
||||
|
|
Final
picture of the angles (Plusses)
09 April 2019
14:01
<<NegHloopP.pdf>>
<<PosHloopP.pdf>>
Final
picture of the angles (Crosses)
09 April 2019
14:01
<<PosHloopC.pdf>>
<<NegHloopC.pdf>>
:
10 April 2019
17:38

(1)
Structures measured
|
|
|
(2) Measurement type |
Hloop_gradiometry |
|
|
|
|
|
|
|
|
|
(3) Cables Setup:
|
|
|
|
|
|
|
|
|
|
|
|
|
Gate (9) |
|
|
(4) Magnet Setup:
|
Range: |
|
|
Rate: |
|
(5) Experiment Setup:
|
T |
|
|
|
|
|
|
1
MΩ |
|
|
0 |
|
|
0 |
|
|
1
MΩ |
|
|
μA |
|
|
μA |
|
|
0 |
|
|
|
(8) Filename and data:
(6) Lock-In Setup:
|
Sens: |
20 μV |
|
τ: |
1s |
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
(7) Important
Notes:
m408: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Montag, 2. März 2020
09:58
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
m409: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Montag, 2. März 2020
10:00
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
Change Angle 90: m410: ParallelFast
Hloop_(90)deg_300mT/min
Montag, 2. März 2020
10:01
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
m411: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Montag, 2. März 2020
10:03
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
Change Angle 90: m412/413: ParallelFast Hloop_(90)deg_300mT/min
Montag, 2. März 2020
10:05
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
Compare m414-419 Repeated measurements

Montag, 2. März 2020
11:34

m414: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Montag, 2. März 2020
10:06
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|

m415: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Montag, 2. März 2020
10:06
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|

m416: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Montag, 2. März 2020
10:06
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|

m417: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Montag, 2. März 2020
10:07
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|

m418: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Montag, 2. März 2020
10:07
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|

m419: SLOW PlussesCrossesEmpty_Parallel Hloop_(90)deg_2mT/min
Montag, 2. März 2020
10:14
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|


m420: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Mittwoch, 4. März 2020
16:29
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|

m421: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Mittwoch, 4. März 2020
16:31
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|

m422: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Mittwoch, 4. März 2020
16:32
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|

m423: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Mittwoch, 4. März 2020
16:32
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
Change Angle m424: ParallelFast Hloop_(90)deg_100mT/min
Dienstag, 10. März 2020
13:43
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
m425/26: PlussesCrossesEmpty_Parallel
Relaxation_(90)deg_5mT/min
Dienstag, 10. März 2020
13:44
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
m427: PlussesCrossesEmpty_Parallel
Relaxation_(90)deg_5mT/min
Dienstag, 10. März 2020
13:47
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
m428: PlussesCrossesEmpty_Parallel Hloop_(90)deg_10mT/min
Dienstag, 10. März 2020
13:48
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 40/1000*50 = |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|

Change Angle: 10deg
Mittwoch, 11. März 2020
12:02
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
m429: Plusses_Hloop_(10)deg
Sonntag, 7. April 2019
01:34

|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|
R12 = 260/1000*50 = 13 |
|||||||||
|
|
|
|||||||||
|
|
|||||||||
|
|
|||||||||
|
|

Change Angle: 45deg
Mittwoch, 11. März 2020
12:02
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
|
||
|
|
Aiming
for Hall Voltage:
![]()
Voltage
measured:
![]()
m430: Plusses_Gradio
Hloop_(45)deg_10mT/min
Mittwoch, 11. März 2020
15:01
|
Float/Ground: |
Ground |
|
AC/DC: |
AC |
|
A/A-B: |
A-B |
|
Reserve: |
Normal |
|
Source: |
Internal |
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
|
|
R12 = 270/1000*50 = 13,5 |
||||
|
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|